Heat Treatment Practice for 1.2344 (DIN 1.2344)
Heat treatment decides whether 1.2344 reaches its intended properties. The grade can be correct, the analysis can be correct and the part can still fa
Keyspark Steel
Heat treatment decides whether 1.2344 reaches its intended properties. The grade can be correct, the analysis can be correct and the part can still fail if the cycle is copied from a similar job with a different section size.
Delivery condition
Material is normally supplied as hardened and tempered to 44 to 50 HRC. Record the incoming condition before any processing begins, because a hardness check on arrival is the cheapest way to catch a mix-up before value is added to the part.
Austenitising and quenching
Austenitise at 1020 to 1050 C, quench in air or in a vacuum furnace, temper twice at 500 to 600 C. Avoid tempering between 300 and 450 C where toughness drops.
Distortion and dimensional control
Sections in this family move during quenching. Allowance for distortion, careful support in the furnace, controlled quench agitation and, on large parts, rough machining before heat treatment followed by finish machining afterwards are the practical controls.
Inspection after heat treatment
Require hardness readings at defined positions, a hardness survey through the section where hardenability matters, and non destructive testing where the part carries load. A certificate that reports a single surface hardness value proves very little about aluminium die casting dies.
Hubei Keyspark Special Steel Co., Ltd. runs two 20-ton EAF furnaces, two 20-ton LF ladle furnaces, a 20-ton VD unit and a 5-ton ESR furnace, with open-die forging, 12 precision heat treatment furnaces, four vacuum annealing furnaces and over twenty machining centres. Annual capacity is about 15,000 tonnes.
Website: https://keysparksteel.com/
Email: sales@keysparksteel.com
Mobile/WhatsApp: +86 15024056480